10 Marla construction cost.

Reviewed construction estimate for a 10 Marla double-storey house in Lahore, with 3,375 sq. ft. covered area: PKR 16,335,227 including materials and labour.

Reference layout: 4 bedrooms, 5 bathrooms, 2 kitchens and 2 living rooms.

Complete house

PKR 16,335,227

PKR 4,840 per covered sq. ft.

Includes separately estimated labour of PKR 1,787,569.

Work stages

Grey structure: PKR 10,283,539

Finishing: PKR 6,051,688

Cost allocation

Plumbing WorksPKR 971,641
Electrical Works · Rough-inPKR 239,181
Electrical Works · FinishingPKR 1,149,832
Wood, Metal and Tile WorksPKR 4,280,577
Fittings & FixturesPKR 621,279
Foundation & StructurePKR 9,072,716

Make the estimate yours.

Use the calculator to change the covered area, number of floors, bathrooms, kitchens or finish quality. Other layouts use proportional planning allowances.

Open the construction calculator →

An indicative estimate, not a quotation. Land, development charges, architect fees and utility connections are excluded. Actual cost depends on the design, ground conditions, specifications and prices at the time of construction. Item allocations and material quantities are planning estimates, not a measured bill of quantities.